Flooring & Tiling

Flooring & Tiling in Dubai — From AED 20,000, Italian Marble, Porcelain & Hardwood

Italian marble, large-format porcelain and engineered hardwood — professionally levelled, laid and sealed for a flawless, lasting finish.

1–3 Weeks Written Variations 5-Year Workmanship Warranty Itemized BOQ

Flooring & Tiling in Dubai

We supply and install premium flooring across Dubai villas from AED 20,000 — Italian marble, large-format porcelain, natural stone and engineered hardwood. Full scope: removal of existing flooring, substrate levelling and moisture-proofing, precision laying, grouting, polishing and sealing — completed in 1-3 weeks with a 5-Year Workmanship Warranty. Every job starts with proper substrate preparation — the difference between flooring that lasts decades and flooring that cracks or lifts within a year. We laser-level screed, apply moisture barriers where needed, and dry-lay large-format tiles to plan cuts and minimise joints. Options range from durable porcelain for high-traffic living areas to book-matched marble slabs for statement entrances and bathrooms, and warm engineered oak for bedrooms and majlis.

What's Included

  • Removal and disposal of existing flooring
  • Substrate levelling and moisture-proofing
  • Supply of marble, porcelain, stone or hardwood
  • Precision laying and dry-lay planning
  • Grouting, polishing and sealing
  • Skirting and threshold finishing
  • Clean-up and handover
  • 5-Year Workmanship Warranty

Transparent Pricing

Porcelain & Ceramic

AED 20,000 – 45,000

Large-format porcelain, high-traffic durability, per villa floor

Natural Stone & Marble

AED 45,000 – 90,000

Italian marble / travertine, book-matched slabs, polished & sealed

Engineered Hardwood

AED 35,000 – 70,000

Engineered oak/walnut, acoustic underlay, warm finish

Prices are estimates. Get an exact, itemized quote with a free site visit.

Why our quote is the last number you’ll see

Across the UAE, the lowest quote is rarely the final bill. We define the scope and put changes in writing.

Measured, itemized quote with scope and exclusions in writing
Written variations approved before changed work proceeds
Three material options per item, so you control the budget
Free design & site visit before you commit a dirham
3-year workmanship warranty on everything we build
One accountable project manager from measured scope to handover

Frequently Asked Questions

Is marble or porcelain better for Dubai villas?+

Porcelain is more durable and lower-maintenance for high-traffic areas and outdoors, while natural marble gives an unmatched premium look for entrances and bathrooms. Many clients mix both — porcelain in living/wet areas, marble as statement pieces.

Do you level the floor before laying?+

Always. We laser-level the screed and apply moisture barriers where needed. Proper substrate preparation is what stops tiles cracking or lifting later — it's the most important step and it's included.

How long does villa flooring take?+

Most villas take 1-3 weeks depending on area and material. Marble polishing and sealing add a few days, and we schedule room-by-room so you can keep using the rest of the home.

Can you match or replace existing tiles?+

Yes. We source close matches for repairs, or remove and re-lay entire areas for a seamless, consistent finish across the villa.

Ready to start your flooring & tiling?

Free site visit + a fully itemized fixed quote + 3-Year Warranty. No hidden costs, no scope creep.

Call Now WhatsApp