Complete villa renovation: kitchens, bathrooms, flooring, painting, joinery, and landscaping — from AED 150,000, delivered in 8-16 weeks with a 3-Year Warranty.
The short answer
A full villa renovation in Dubai costs from AED 150,000 for a 3–4 bedroom villa to AED 500,000+ for a large luxury villa, and takes 8–16 weeks. Most family villas run AED 250,000–400,000.
From AED 150,000
We renovate villas across Dubai from AED 150,000. Full scope: kitchen, all bathrooms, flooring throughout, painting, electrical, plumbing, joinery, false ceilings, AC servicing, and landscaping — handed over in 8-16 weeks. One in-house team, one dedicated project manager, one fixed-price contract. 3-Year Warranty on all workmanship. A detailed scope document locks in your price before work starts. No cost overruns, no surprise extras. Weekly progress reports with photos keep you informed at every stage. We have delivered 200+ full villa renovations across Dubai — from 3-bedroom townhouses in Springs and Arabian Ranches to 7-bedroom mansions in Emirates Hills, Palm Jumeirah, and Dubai Hills Estate.
Move the slider, pick your finish, see the range instantly — then turn it into a fixed, itemized quote in 24 hours.
Estimated range
AED 1,600,000 – AED 2,400,000
Ballpark only. Your 24h fixed quote is itemized to the dirham.

BEFOREFull villa transformation — Arabian Ranches — drag to reveal
Representative project
“Quoted AED 380,000. Final bill: AED 380,000. Handed back on the day they promised.”
3-4 Bedroom Villa
AED 150,000 – 250,000
Standard finishes, essential upgrades, 8-12 weeks
4-5 Bedroom Villa
AED 250,000 – 400,000
Premium materials, custom joinery, 12-14 weeks
5+ Bedroom / Luxury
AED 400,000 – 500,000+
Full luxury, imported materials, smart home, 14-16 weeks
Prices are estimates. Get an exact, itemized quote with a free site visit.
+15–30% value
A quality renovation lifts resale and rental value — kitchens and bathrooms return the most.
8–16 Weeks
Clear timeline agreed before we start — and we hand back on the day we promise.
In Dubai, the lowest quote is rarely the final bill. We do it differently — and we put it in writing.
For full villa renovations, we recommend moving out for the duration. The dust, noise, and access requirements make living on-site impractical and slows down the work.
We provide a detailed, itemized scope document before starting. Changes are quoted separately and approved by you before proceeding. No surprises.
Yes. We handle all DLD, DED, and community-specific approvals. This is included in the project management scope.
Absolutely. We offer partial renovations too. But full villa renovations are more cost-effective per sqft as trades are mobilized once.
Free site visit + a fully itemized fixed quote + 3-Year Warranty. No hidden costs, no scope creep.