
Exactly what a new kitchen costs in Dubai — by finish level, line by line. Then a fixed, itemized quote in 24 hours with zero hidden costs.
The short answer
A kitchen renovation in Dubai costs AED 45,000–80,000 for a refresh, AED 80,000–150,000 for a mid-range custom kitchen, and AED 150,000–250,000+ for a luxury kitchen with imported cabinetry and stone.
Typical range: AED 45,000 – 250,000+
Three honest tiers. You choose the level — we hold the price.
Same layout
AED 45,000 – 80,000
New countertops, splashback, paint and hardware on the existing layout. The fastest, most cost-effective way to modernise.
Most popular
AED 80,000 – 150,000
New custom joinery, stone countertops, integrated appliances, new flooring and a lighting upgrade. A complete, modern kitchen.
Bespoke & imported
AED 150,000 – 250,000+
Italian cabinetry, marble waterfall island, premium appliance package and bespoke detailing. The centrepiece of a luxury villa.
Move the slider, pick your finish, see the range instantly. Then turn it into a fixed, itemized quote — free, in 24 hours.
Estimated range
AED 81,000 – AED 144,000
Ballpark only. Your 24h fixed quote is itemized to the dirham.

BEFOREKitchen transformation — Dubai Hills — drag to reveal
Representative project
“Quoted AED 92,000, final bill AED 92,000. That never happens in Dubai.”
A line-by-line breakdown — so you can see exactly what you’re paying for.
Cabinetry & joinery
Biggest single cost — local to imported
AED 20,000 – 120,000
Countertops
Quartz, granite or marble
AED 8,000 – 60,000
Appliances (if supplied)
Hob, oven, hood, fridge, dishwasher
AED 15,000 – 80,000
Splashback
Tile, glass or stone
AED 3,000 – 15,000
Plumbing & electrical
Sink, points, extraction
AED 8,000 – 25,000
Flooring
Porcelain or engineered wood
AED 6,000 – 20,000
Lighting
Task, ambient & under-cabinet
AED 4,000 – 15,000
Demolition & disposal
Strip-out of old kitchen
AED 3,000 – 10,000
Four factors decide where you land in the range.
Locally fabricated joinery vs imported Italian/German units is the single biggest swing in price.
Quartz and granite are mid-range; marble and large-format porcelain push cost up sharply.
Keeping plumbing and the layout in place saves significantly versus relocating the sink and services.
Whether you supply your own or include a premium integrated package changes the total materially.
+10–20% value
The kitchen is the single most impactful upgrade in a Dubai villa — it adds both lifestyle value and measurable resale value.
Timeline
3–6 weeks for most kitchens, depending on joinery lead time.
In Dubai, the lowest quote is rarely the final bill. We do it differently — and we put it in writing.
Send us photos or a floor plan. We’ll respond with a detailed, fixed, itemized breakdown — free, no obligation.