Swimming Pool in District One

Swimming Pool in District One — From AED 90,000, Fixed Price

Swimming Pool for District One villas, on a fully itemized fixed quote — no hidden costs, 8–14 Weeks, 3-Year Warranty.

8–14 Weeks 0 Hidden Costs 3-Year Warranty 800+ Villas

The short answer

A swimming pool in Dubai costs from AED 45,000 for a splash pool to AED 250,000+ for an infinity or custom design, and takes 6–10 weeks to build or fully renovate.

From AED 90,000

Swimming Pool in District One in Dubai

Swimming Pool in District One covers custom pool design and construction — excavation, shell, filtration, finishes, decking and lighting. District One in Mohammed Bin Rashid City is an ultra-prime community of mansions around the Crystal Lagoon. Because District One mansions are ultra-prime MBR City homes where renovations are large, design-led and material-intensive, our swimming pool work here is scoped specifically for District One: Meydan / Sobha community standards, Meydan / Dubai Municipality approvals where required, and finishes that suit District One's contemporary villa and larger homes. Every District One swimming pool project is delivered on a fixed, itemized quote — from aed 90,000, typically 8–14 Weeks — using mosaic or pebble finishes, LED lighting, energy-efficient filtration and optional heating. No hidden costs, no scope creep, 3-Year Warranty. 20+ projects already delivered in District One.

What's Included

  • Itemized fixed quote and design
  • Excavation and reinforced shell
  • Filtration and circulation system
  • Mosaic/pebble finish and coping
  • LED lighting and decking
  • 3-Year Warranty

See the transformation

Drag to reveal the before and after — real Dubai projects, fixed-price delivery.

Pool transformation — District One — after
Pool transformation — District One — beforeBEFORE
AFTER

Pool transformation — District One — drag to reveal

Representative project

District One
8 weeks
Full pool renovation — glass mosaic, new filtration, LED lighting, deck & landscaping
AED 135,000 fixed

Our garden went from embarrassing to the best feature of the house. Exactly on budget.

Transparent Pricing

Starting

From AED 90,000

Entry scope for District One homes, quality materials

Mid-Range

Quoted on free site visit

Custom design and premium materials

High-End

Quoted on free site visit

Full bespoke design, imported finishes

Prices are estimates. Get an exact, itemized quote with a free site visit.

Why our quote is the last number you’ll see

In Dubai, the lowest quote is rarely the final bill. We do it differently — and we put it in writing.

Itemized fixed quote within 24 hours — every line, every dirham
Zero hidden costs — the number you sign is the number you pay
Three material options per item, so you control the budget
Free design & site visit before you commit a dirham
3-year workmanship warranty on everything we build
DED-licensed & fully insured — one project manager, daily updates

Frequently Asked Questions

How much does swimming pool cost in District One?+

Swimming Pool in District One starts from aed 90,000. You receive a fully itemized fixed quote after a free site visit — every line priced before you commit, with no hidden charges.

Do I need approvals for swimming pool in District One?+

District One (MBR City) enforces master-developer review plus DM permits for external works; we handle the full approval process.

How long does swimming pool take in District One?+

Most District One swimming pool projects take 8–14 Weeks. We confirm an exact timeline in your fixed-price proposal and assign a dedicated project manager.

Is there a warranty?+

Yes — 3-Year Warranty on all workmanship for every District One project.

Cost guides

Popular communities

Ready to start your swimming pool in district one?

Free site visit + a fully itemized fixed quote + 3-Year Warranty. No hidden costs, no scope creep.

Call Now WhatsApp
EnglishالعربيةРусский中文