
Bathroom Renovation for Dubai Production City villas, on a fully itemized fixed quote — no hidden costs, 3–5 Weeks, 3-Year Warranty.
The short answer
A bathroom renovation in Dubai costs from AED 25,000 and takes 3–5 weeks. A full standard bathroom with new waterproofing, tiling and a walk-in shower typically runs AED 35,000–50,000.
From AED 35,000
Bathroom Renovation in Dubai Production City covers spa-grade bathroom renovation — waterproofing, tiling, sanitaryware, vanities, glass and lighting. Dubai Production City (formerly IMPZ) has villa clusters such as Centrium and The Crescent. Because Dubai Production City villas are value-focused homes popular for upgrades and rental-ready refurbishments, our bathroom renovation work here is scoped specifically for Dubai Production City: Tecom / Dubai Properties community standards, Dubai Municipality approvals where required, and finishes that suit Dubai Production City's cluster villa and larger homes. Every Dubai Production City bathroom renovation project is delivered on a fixed, itemized quote — from aed 35,000, typically 3–5 Weeks — using large-format porcelain, rain showers, frameless glass and premium fittings. No hidden costs, no scope creep, 3-Year Warranty. 8+ projects already delivered in Dubai Production City.
Move the slider, pick your finish, see the range instantly — then turn it into a fixed, itemized quote in 24 hours.
Estimated range
AED 36,000 – AED 80,000
Ballpark only. Your 24h fixed quote is itemized to the dirham.

BEFOREBathroom transformation — Dubai Production City — drag to reveal
Representative project
“Turned a dated 2000s bathroom into something out of a five-star hotel — on the exact number quoted.”
Starting
From AED 35,000
Entry scope for Dubai Production City homes, quality materials
Mid-Range
Quoted on free site visit
Custom design and premium materials
High-End
Quoted on free site visit
Full bespoke design, imported finishes
Prices are estimates. Get an exact, itemized quote with a free site visit.
+10–20% value
A quality renovation lifts resale and rental value — kitchens and bathrooms return the most.
3–5 Weeks
Clear timeline agreed before we start — and we hand back on the day we promise.
In Dubai, the lowest quote is rarely the final bill. We do it differently — and we put it in writing.
Bathroom Renovation in Dubai Production City starts from aed 35,000. You receive a fully itemized fixed quote after a free site visit — every line priced before you commit, with no hidden charges.
Dubai Production City villas need DM permits for external works; we manage drawings and approvals.
Most Dubai Production City bathroom renovation projects take 3–5 Weeks. We confirm an exact timeline in your fixed-price proposal and assign a dedicated project manager.
Yes — 3-Year Warranty on all workmanship for every Dubai Production City project.
Free site visit + a fully itemized fixed quote + 3-Year Warranty. No hidden costs, no scope creep.