
Low-rise to mid-rise developments built end to end — design, structure, MEP and finishing on a fixed contract, with milestone drawdowns and a 10-year structural warranty.
The short answer
Building construction in Dubai costs roughly AED 300–450 per sq ft for residential buildings, AED 450–600 per sq ft for mixed-use, and AED 550–700 per sq ft for commercial — per square foot of built-up area, excluding land — over a 12–30 month programme.
AED 300 – 700 / sq ft (BUA)
We construct residential and commercial buildings across Dubai — apartment blocks, mixed-use developments, showrooms and commercial premises. Full turnkey delivery: design coordination, structural engineering, foundation and superstructure, MEP, vertical transportation, facade and finishing. We manage all approvals — Dubai Municipality, DEWA, Civil Defence, and authority NOCs — and deliver on a fixed contract with milestone-based drawdowns and transparent cost reporting throughout.
Move the slider, pick your finish, see the range instantly — then turn it into a fixed, itemized quote in 24 hours.
Estimated range
AED 9,000,000 – AED 12,000,000
Excludes land & authority charges. 24h itemized quote.

BEFOREStructure to handover — JVC — drag to reveal
Representative project
“Milestone drawdowns matched verified progress and the monthly cost reports meant zero surprises at the end.”
Residential
AED 300 – 450 / sq ft
Apartment / residential building, standard spec
Mixed-Use
AED 450 – 600 / sq ft
Residential + retail, higher finish & services
Commercial
AED 550 – 700 / sq ft
Commercial / showroom, premium facade & MEP
Prices are estimates. Get an exact, itemized quote with a free site visit.
In Dubai, the lowest quote is rarely the final bill. We do it differently — and we put it in writing.
In 2026, building construction in Dubai costs roughly AED 300–450 per sq ft for residential buildings, AED 450–600 per sq ft for mixed-use, and AED 550–700 per sq ft for commercial buildings — per square foot of built-up area, excluding land.
A low-rise to mid-rise building typically takes 12–30 months depending on height, complexity and approvals.
Dubai Municipality building permit, DEWA, Civil Defence, and the relevant authority NOCs. We manage the full approval cycle and authority coordination as part of the contract.
On a fixed contract with milestone-based drawdowns tied to verified construction progress, plus transparent monthly cost and programme reporting.
Yes — a 10-year structural warranty, plus a defects-liability period covering MEP and finishes.
Free site visit + a fully itemized fixed quote + 3-Year Warranty. No hidden costs, no scope creep.